Newsletter

MR2 TURBO FOR ELECTRICAL REPAIRS, MAINTENANCE AND FABRICATION

Here I will show you work done on the lovely blue mr2 turbo, the visit was for timing belt, maintenance, fabrication and paintwork

Timing side of engine stripped down and oil leaks addressed 

All new parts ready for install

Oil pump cleaned up and re-installed

O/s driveshaft centre bearing worn with excess play

Fabrication work started on rear end sills, pictures show stages of work from cutting out, to prepping, welding and finishing touches

All welds zinc primed and sealed once dry and complete

 

After paintwork done